Our speciality

Fibre optics handed over measured, not assumed

Most delays in a fibre deployment do not come from the cabling, but from uncertified closures and badly organised head-ends. We carry out the full outside and inside plant cycle with our own equipment and personnel, and we close with exact optical certification.

  • hubOutside plant: aerial and underground fibre, backbone and last mile.
  • lanInside plant: ODF installation, communications racks and technical organisation of head-ends.
  • precision_manufacturingMeasurement and certification with our own OTDR and power meter.
  • groupsSplicers qualified in fibre optic handling, laying and fusion.
Fibre optics handed over measured, not assumed
Full portfolio

End to end infrastructure and connectivity

01

cell_towerRadiating systems and base stations (3G, 4G LTE and 5G)

We put your base station into service meeting 100% of radio access network standards. Fewer audit findings and fewer return visits.

  • check_smallAntenna and radiating system installation
  • check_smallIntegration and commissioning
  • check_smallTower structure conditioning
  • check_smallTesting and documented handover
Radiating systems and base stations (3G, 4G LTE and 5G)
02

settings_input_antennaMicrowave transmission (MW)

High availability radio links installed and aligned so your transmission network carries traffic without degradation.

  • check_smallMW antenna installation
  • check_smallLink alignment and optimisation
  • check_smallEquipment replacement and upgrade
  • check_smallHop measurement and certification
Microwave transmission (MW)
03

boltCritical power and backup

Most outages are not network outages, they are power outages. We install and maintain the backup that keeps your site on air.

  • check_smallMedium and low voltage AC systems
  • check_smallControl and transfer switchboards
  • check_smallBattery banks and rectifiers
  • check_smallGenerator sets MG / ATS
Critical power and backup
04

foundationCivil works and earthing systems

We leave the site ready to receive equipment and protected against discharges, with the documentation the regulations require.

  • check_smallSite construction and repair
  • check_smallEarthing systems
  • check_smallFencing, foundations and site conditioning
  • check_smallLifts with hydraulic crane truck
Civil works and earthing systems
05

routerFTTH and last mile (GPON)

We connect your end customer faster: from drop fibre cabling to ONT installation, with optical power verified at every service drop.

  • check_smallDrop fibre cabling
  • check_smallConnectorisation and splicing
  • check_smallONT installation and configuration
  • check_smallOptical power certification
FTTH and last mile (GPON)
How it fits together

The full path, from head-end to subscriber

Every leg of this diagram is a front we cover ourselves. That is why you do not need to coordinate four different contractors to get a site on air.

Cabecera OLT y ODF Estación base 3G · 4G · 5G y MW Mufa Empalme y sangrado Splitter Reparto GPON Abonado ONT · última milla

Reference diagram. The final design depends on the survey and on your network topology.

Continuity management (O&M)

Keeping your network in service after handover

Installing is half the job. The other half is your site still transmitting next quarter.

checklist

Preventive maintenance

Monthly technical inspections, site conditioning and proactive measurements that catch degradation before it becomes an outage.

support_agent

24/7 corrective response

Permanent standby for critical incidents, with service restored in minimum time and a report of the event.

rocket_launch

Modernisation (upgrades)

Technology updates and component replacement to expand traffic capacity without building a new site.

Methodology

How we carry out every project

Fast work with documentary traceability at every stage.

Survey

Engineering survey and on-site inspection before committing to deadlines.

Design

Splice diagrams and cable routes approved by you.

Execution

Cabling, splicing and installation in outside and inside plant with our own crews.

As-built handover

A dossier with a photographic report and exact optical certifications.

Why it stays up

The power chain that keeps the station running

Two paths to the same load. When the mains fail, the transfer kicks in and the site keeps transmitting without anyone noticing.

Acometida AC Red comercial Planta y ATS Transferencia automática Tablero Protección y medida Rectificador AC a −48 V DC Banco de baterías Autonomía de respaldo Carga del sitio Radio y transmisión

We size autonomy and the battery bank against the consumption actually measured on site.

Technical questions

About the scope of our services

Do you install aerial and underground fibre optics?

Yes. We deliver both outside plant modes, including backbone, distribution and last mile, as well as inside plant with ODFs, racks and head-end organisation.

What test equipment do you use to certify an optical link?

Precision fusion splicers and latest generation OTDR and power meter equipment, all our own. That lets us certify the job on the same day it is closed.

Can you integrate base stations from any operator?

We work with 3G, 4G LTE and 5G mobile network infrastructure following the radio access network (RAN) installation standards set by the operator or the integrator responsible for the site.

What does preventive maintenance of a site include?

Technical inspection, cleaning, clearing of vegetation and painting of the site, review of power and earthing, and proactive link measurements. Everything is documented in the cycle report.

Which of these fronts is costing you time today?

Tell us the scope, the location and the deadlines. We reply with a concrete execution plan.